Case Studies
Bartell Hotels
07/19/2023
Bill Howe
Remove the aging and broken 900 gallon storage tank, replace it with an up-to-date efficient, robust water storage system capable of handling heavy demand for a hotel and music venue. Create an outlet solution that accommodates a low ceiling height.
Read More
California State Office Building
07/18/2023
Bill Howe
Restore the building’s failing rain leaders without damaging the building or disrupting operations.
Read More
REI HOA – 230 Prospect
07/16/2023
Bill Howe
Large carbon footprint due to older, less efficient hot water equipment. Maintenance and repairs on existing equipment required water shut offs to the whole building, causing inconvenience to residents. A need for a modern, robust and reliable hot water solution to meet the demands of a luxury apartment complex.
Read More
The Plaza HOA
07/15/2023
Bill Howe
Aging pipes incurring substantial costs for the HOA, including sewage remediation within units, frequent drain cleaning, piping repairs, and lost revenue from Airbnb rentals for homeowners.
Read More
University of San Diego
07/14/2023
Bill Howe
The university required an efficient and reliable solution to replace the water heating infrastructure for four dormitories housing roughly 1060 students. Due to the beautiful and unique landscaping on the campus, a crane was not feasible to remove the old rooftop boilers.
Read More