Case Studies
SRM Investments – Commercial Plumbing
04/10/2024
Bill Howe
Project Overview Bill Howe upgraded the hot water system in an apartment complex with minimal disruption, completing the project in 5-6 weeks with a 10-year warranty, ensuring safety and efficiency. Challenge: Replace all hot water lines in a two-building apartment complex. Perform work with a strong emphasis on not disrupting residents. Solution: Replaced main and […]
Read More
FDC Management – Commercial Plumbing
03/21/2024
Bill Howe
Project Overview Bill Howe Plumbing (BHP) undertook a substantial project to reroute hot and cold water lines for a 36-unit apartment complex, divided into two buildings. The project aimed at enhancing the efficiency and reliability of the water supply system, ensuring long-term sustainability and compliance with current standards. Challenge: The apartment complex faced significant issues […]
Read More
California State University San Marcos – Commercial Lining
03/21/2024
Bill Howe
Project Overview Challenge: Rehabilitate existing 250 linear feet of aging chilled water lines installed behind structural members and other utility lines within difficult-to-reach and inaccessible spaces in the Art Building. Solution: Utilize NuFlow NuLine epoxy barrier coating technology to efficiently restore pipe functionality, ensuring the chilled water system’s effectiveness with minimal structural impact. Location: San […]
Read More
Bartell Hotels – Commercial Plumbing
07/19/2023
Bill Howe
Remove the aging and broken 900 gallon storage tank, replace it with an up-to-date efficient, robust water storage system capable of handling heavy demand for a hotel and music venue. Create an outlet solution that accommodates a low ceiling height.
Read More
The Salk Institute – Commercial Lining
07/19/2023
Bill Howe
Rehabilitate an aging underground sewer main without causing any disruption to the prestigious campus or damaging its architecture.
Read More
California State Office Building – Commercial Lining, Government
07/18/2023
Bill Howe
Restore the building’s failing rain leaders without damaging the building or disrupting operations.
Read More
REI HOA 230 Prospect – Commercial Plumbing
07/16/2023
Bill Howe
Large carbon footprint due to older, less efficient hot water equipment. Maintenance and repairs on existing equipment required water shut offs to the whole building, causing inconvenience to residents. A need for a modern, robust and reliable hot water solution to meet the demands of a luxury apartment complex.
Read More
The Plaza HOA – Commercial Lining
07/15/2023
Bill Howe
Aging pipes incurring substantial costs for the HOA, including sewage remediation within units, frequent drain cleaning, piping repairs, and lost revenue from Airbnb rentals for homeowners.
Read More