Case Study Archive - Bill Howe

Case Study

Case Study Post Type

A photograph of two apartment buildings

SRM Investments – Commercial Lining

Project Overview Bill Howe upgraded the hot water system in an apartment complex with minimal disruption, completing the project in 5-6 weeks with a 10-year warranty, ensuring safety and efficiency. Challenge: Replace all hot water lines in a two-building apartment complex. Perform work with a strong emphasis on not disrupting residents. Solution: Replaced main and …

SRM Investments – Commercial Lining Read More »

FDC Management – Commercial Plumbing

Project Overview Bill Howe Plumbing (BHP) undertook a substantial project to reroute hot and cold water lines for a 36-unit apartment complex, divided into two buildings. The project aimed at enhancing the efficiency and reliability of the water supply system, ensuring long-term sustainability and compliance with current standards. Challenge: The apartment complex faced significant issues …

FDC Management – Commercial Plumbing Read More »

California State University San Marcos – Commercial Lining

Project Overview Challenge: Rehabilitate existing 250 linear feet of aging chilled water lines installed behind structural members and other utility lines within difficult-to-reach and inaccessible spaces in the Art Building. Solution: Utilize NuFlow NuLine epoxy barrier coating technology to efficiently restore pipe functionality, ensuring the chilled water system’s effectiveness with minimal structural impact. Location: San …

California State University San Marcos – Commercial Lining Read More »

Bartell Hotels – Commercial Plumbing

Remove the aging and broken 900 gallon storage tank, replace it with an up-to-date efficient, robust water storage system capable of handling heavy demand for a hotel and music venue. Create an outlet solution that accommodates a low ceiling height.

REI HOA - 230 Prospect

REI HOA 230 Prospect – Commercial Plumbing

Large carbon footprint due to older, less efficient hot water equipment. Maintenance and repairs on existing equipment required water shut offs to the whole building, causing inconvenience to residents. A need for a modern, robust and reliable hot water solution to meet the demands of a luxury apartment complex.

The Plaza HOA – Commercial Lining

Aging pipes incurring substantial costs for the HOA, including sewage remediation within units, frequent drain cleaning, piping repairs, and lost revenue from Airbnb rentals for homeowners.